Abstract:The main bridge of Suba Bridge in Leshan-Xichang Expressway is a net span-350 m deck-type reinforced concrete stiff-skeleton arch bridge. The combined foundation of arch support and pile foundation is used for the main arch. The main arch is an equal-section catenary hingeless arch. And the form of a double-arch rib with a single-box double-chamber section is used for the arch ring. The main arch is constructed by a strong stiff skeleton method. The stiff skeleton is a truss structure composed of section steel and concrete filled steel tube. The skeleton steel tube is filled with C120 ultra-high strength compensated shrinkage self-compacting concrete. The stiff skeleton is continuously pumped with the concrete inside pipe after assembled and closed by cable-stayed buckle system. The arch ring outer C55 concrete combined structure is loaded with two rings and segmented pouring, which effectively saves the construction period. The approach pile foundation + rock anchor combined anchorage is used for the hoisting system and the buckle hanging system. The bridge area is located in a high-intensity seismic zone. Therefore, in addition to considering the lightweight structure of the bridge, an anti-seismic system of arch bridge structure is innovatively designed, which is composed of multi-directional anti-falling beam device, longitudinal variable stiffness support and viscous damper.