Abstract:The Hancheng City Taishi Avenue West Extension Bridge Construction Project is to connect the Hancheng New District and Xiangshan Forest Park in an elevated form. The main bridge is an arch-pylon cable-stayed bridge. Its span layout is 108 m + 128 m. The cable pylon is a vertical arch pylon. And the girder is a double-side box steel girder. In order to ensure the welding quality of the special-shaped structure, the overall construction scheme of "horizontal assembly, integrated vertical lifting rotation" is adopted for the cable pylon, and the rotating method of "bracket in pylon and vertical rotation while dragging" is creatively proposed, which can provide a useful reference for similar projects.