Abstract:With the development of the economy and society, much of the urban infrastructure is being demolished to build new ones. The use of blasting to demolish bridges is an important construction technique, in which the safety constraints in the design are often based on the blasting vibration distance and the scattering distance of blasting products. During the blasting demolition of a continuous box girder bridge on the waterway of Lijiang River in a scenic city, the engineering waste generated by the blasting would become the first factor of environmental pollution affecting the water area of Lijiang River. Therefore, in the blasting design and construction process, the blasting technical measures such as superstructure partition and pier pretreatment are taken to protect the environment of Lijiang River waterway so as to effectively reduce the environment pollution of the waterway caused by blasting engineering waste.