Abstract:Aiming at the pollution situation of the black and odorous water body in Banhu River of Dongguan City, the composite process of “grille + air flotation + coupled process (A2O + ecological treatment + biofilm) + deep filtration + disinfection” is used to build a physical的biochemical的ecological system for the comprehensive control. The operational results indicate that after the systematically advanced treatment, the nutrients such as nitrogen, phosphorus and organic matter can be effectively treated. The indicators including chemical oxygen demand, 5-day biochemical oxygen demand, ammonia nitrogen, total nitrogen and total phosphorus can all meet the Class A standard of Pollutant Discharge Standard for Municipal Wastewater Treatment Plant(GB 18918—2002). The corresponding annual mean values of effluent are 16.65, 4.11, 0.31, 8.79, 0.14 mg/L, respectively. And the average removal rates are 89.6%, 91.3%, 98.7%, 70.6% and 94.1%, respectively.