Abstract:Owing to the good compressive performance of concrete bridge decks and the excellent tensile and shear resistance of steel beams, the fabricated simple-supported steel-concrete composite beam with an economic span of up to 60 meters is mainly used to span the expressways and urban trunk roads. However, the local stiffness of the upper flange of the steel beam is low, which will lead to the high risk of instability in the integral hoisting of the steel beam and the concrete construction of the bridge decks. Relying on the Jiuzhou Elevated East Extension Project in Nanchang City, the local stability problem of the upper flange steel plate is solved by thickening the steel plate and increasing the local stiffness in order to realize the integral hoisting of the steel beam and solve the construction difficulties of special nodes in practical projects.