Abstract:Relying on the Minpu Bridge III Project, the central water operation platform of large rivers is studied and analyzed. By fully considering the impacts of waterway navigation, river width, surrounding environment and transportation conditions, the construction scale and functional design of the over-water construction platform are analyzed. The division of functional areas, berth material transportation design, power and water supply, concrete mixing station, tower crane, cranes and other important equipment layout and reconstruction as well as the safe protection of platform are specially introduced. At the same time, the monitoring methods and results of the platform are introduced. The monitoring data and the application of platform functions indicate that the platform is safe and stable in the whole service period, and the functional zoning is reasonable to fully meet the construction needs of the main pier and main pylon.