盾构隧道环间纵向力时变特征现场试验及理论分析
作者:
作者单位:

中铁十四局集团大盾构工程有限公司,江苏 南京 210000

作者简介:

单晓波(1991—), 男, 本科, 工程师, 从事盾构隧道施工管理工作。

通讯作者:

中图分类号:

U451.4

基金项目:


Field Test and Theoretical Analysis on Time-varying Characteristics of Longitudinal Force between Rings in Shield Tunnels
Author:
Affiliation:

China Railway 14th Bureau Group Big Shield Engineering Co., Ltd., Nanjing 210000, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    盾构隧道环间纵向力的变化规律对管片环间止水垫设计分析尤为重要,但受限于监测方法,环间纵向力难以量测。以南京市江心洲污水收集系统二通道(穿越夹江段)新建工程为工程背景,通过环间预埋传感器监测了混凝土管片端面从接触到千斤顶施加荷载再到卸载的重复拼装掘进过程中的纵向力变化趋势,并推导了纵向力计算公式,得到结论:管片环间的纵向力变化会随着盾构掘进和拼装阶段时千斤顶的顶进和撤离而变化,数值范围在0~10 MPa;距离监测环3环以后的管片掘进阶段,实测纵向力值略小于PLC数据,比值约为0.8,拼装阶段的环间压力实测值总体上小于PLC数据,比值波动在0.3~0.95不等;随着盾构隧道不断向前施工,环间纵向力不断衰减,直到隧道掘进到第463环时,监测环间残余约0.2 MPa的纵向力。

    Abstract:

    The change rule of the longitudinal force between the rings of shield tunnel is especially important for the design and analysis of the water stop pad between the segment rings, but it is difficult to measure the longitudinal force between the rings due to the limitation of the monitoring method. Taking the new project of Nanjing Jiangxinzhou Sewage Collection System Channel II (crossing the Sandwich River section) as the engineering background, the pre-buried sensors in the inter-ring monitor the trend of longitudinal force change in the repeated assembling tunneling process of the end face of the concrete segments from the contact to the jack loading and then to the unloading, and the longitudinal force formula is deduced for calculation. The conclusions are that the longitudinal force between the segments and rings will change with the jacking and withdrawal of jacks during the shield tunneling and assembly stages. The values range from 0 to 10 MPa. The measured longitudinal force value is slightly less than the PLC data in the segment tunneling stage after the monitoring ring 3. The ratio is around 0.8. The measured value of inter-ring pressure in the assembly stage is generally smaller than the PLC data. The ratio is fluctuating from 0.3 to 0.95. The longitudinal force between the rings is decreasing as the shield tunneling is continuous in the forward direction until the shield tunneling to the 463 ring, the residual longitudinal force between the rings is monitored at about 0.2 MPa.

    参考文献
    相似文献
    引证文献
引用本文

单晓波.盾构隧道环间纵向力时变特征现场试验及理论分析[J].城市道桥与防洪,2025,(5):311-315.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-10-21
  • 最后修改日期:2025-01-01
  • 录用日期:2025-01-09
  • 在线发布日期: 2025-05-23
  • 出版日期:
关闭