Abstract:The flying-wing steel arch ribs of Baigou Yin River Liutong Bridge in Xiongan are the decorative components. The mechanical characteristics are quite different from those of the conventional beam-arch composite bridge. The layout separated from the main beam imposes significant restrictions on the selection of construction schemes. By comprehensively demonstrating and comparing the advantages and disadvantages of five commonly used arch rib installation construction methods in terms of structural stress impact, temporary facility engineering quantity, construction period, construction difficulty, safety risk control, etc., the cantilever bracket method with the strongest adaptability to the construction environment is selected for arch rib installation. Based on the influences of bracket stress and deformation, and the bearing capacity of the main girder on the construction sequence during the different construction stages, the integral solution of bracket layout, reserved construction passageway, overall construction sequence, arch rib segment installation sequence and key structure treatment is given, and the implementation effect is good, which can be referred for the construction of similar landscape bridges.