Abstract:To address the east-west fragmentation of Longbei Mountain caused by the construction of Taodu Road in Yixing City, as an engineering technical measure, the repair of a landscape green bridge is to reconstruct the mountain network and restore its ecological functions. The composite system of "fabricated simple-supported slab girder structure + spatial decorative truss" is innovatively used to construct the green bridge. The simple-supported slab girder is used to form the structural framework. The three-dimensional curved decorative truss is used to realize the appearance of the bridge. And the bridge deck greening restore the trend of the mountain. This project can realize the rapid construction, which not only shortens the construction period, but also saves the engineering cost. The completed project successfully connects the mountains, achieves the goal of ecological restoration, and gains the good economic and social benefits, which provides a replicable and referring case for similar urban ecological restoration projects.