Abstract:The slurry balance shield has become the first construction method of cross-river tunnel or subsea tunnel because of its unique ability to balance soil pressure, but a large amount of muck during shield tunneling will be generated for treatment. In order to promote the resource utilization of shield muck, based on the composition and classification of muck, the control indicators for its application in grouting materials, roadbed filling materials, non-fired bricks, etc. are determined. And the muck separation process is optimized. The preparation process of grouting materials, the optimized process flow of muck solidification improvement and the production process flow of non-fired bricks are proposed.