岩溶地区水处理构筑物基础设计施工探讨
作者:
作者单位:

作者简介:

毛江才(1972—), 男, 本科, 高级工程师, 从事建设工程质量监督管理工作。

通讯作者:

中图分类号:

TU473

基金项目:

杭州市建设科研项目(杭建科[2023]85号)


Discussion on Foundation Design and Construction of Water Treatment Structure in Karst Areas
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    基于周边环境极其复杂且岩溶发育场地内的水处理工程,对基础选型进行探讨,得出适用性最高的为灌注桩基础。采用一桩一孔补充勘察判断岩溶分布的情况,以桩端嵌岩深度为原则确定桩长。根据试桩过程中出现的混凝土超灌、流失、串孔等问题,分析并探讨不同处理方法的效果,提出“由外向内、有溶洞到无溶洞、由大到小、由多到少、由深到浅”跳打桩方案和全套筒不拔出处理中大型溶洞、超灌混凝土处理小型溶洞、预注浆处理无法明确的溶洞等处理方案,为大规模成桩提供良好的技术支撑。最后,对溶洞的勘察、设计和施工经验进行总结,得出岩溶分布具有较强的不确定性,超前勘察是制定溶洞处理方案的必要前提,设计和施工过程中尚需根据溶洞的实际情况进行动态调整,以确保处理的效果、桩端入岩的深度和成桩的完整性。

    Abstract:

    Based on the extremely complex surrounding environments and karst development sites, the selection of foundation type of water treatment project is discussed. The highest applicability of cast-in-place pile foundation is given. The distribution of karst is judged by supplementary investigation of one pile and one hole, and the pile length is determined according to the principle of the embedded rock depth at the pile tip. Based on the problems such as over-pouring, loss and cross-hole of concrete that occurred during the pile test process, the effects of different treatment methods are analyzed and discussed. The jumping pile driving scheme from outside to inside, from having karst caves to having no karst caves, from large to small, from many to few, and from deep to shallow is proposed, and the treatment schemes such as the full sleeve without pull-out treatment for medium and large karst caves, the over-poured concrete treatment for small karst caves, and the pre-grouting treatment for karst caves that cannot be clearly identified are put forward in order to give the good technical support for pile forming in the large scale. Finally, the experience in the investigation, design and construction of karst caves is summarized. It is concluded that the karst distribution has strong uncertainty, and the advanced exploration is a necessary prerequisite for formulating a treatment scheme for karst caves. During the design and construction process, the dynamic adjustments still need to be made according to the actual situation of the cave to ensure the treatment effect, the depth of the pile tip entering the rock and the integrity of the pile forming.

    参考文献
    相似文献
    引证文献
引用本文

毛江才,张文宏,徐正荣.岩溶地区水处理构筑物基础设计施工探讨[J].城市道桥与防洪,2025,(7):387-391.