崇明区骨干河道治理现状及“十五五”工作展望
作者:
作者单位:

1.上海市水利工程设计研究院有限公司,上海市 200056
2.上海市崇明区水务局,上海市 202150
3.上海市崇明区河湖管理中心,上海市 202150

作者简介:

杨蔚为(1989—), 男, 硕士, 高级工程师, 从事城市防洪及水环境治理相关工作。

通讯作者:

中图分类号:

TV222

基金项目:


Current Situation and15th Five-Year Plan Work Outlook for River Regulation
Author:
Affiliation:

1.Shanghai Water Conservancy Engineering Design Institute Co., Ltd., Shanghai 200056, China
2.Shanghai Chongming Water Affairs Bureau, Shanghai 202150, China
3.Shanghai Chongming River and Lake Management Center, Shanghai 202150, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    骨干河道是崇明三岛防汛除涝和水资源调度中最重要的河道,崇明全区共有骨干河道40条,截止“十三五”末期,骨干河道整治率约为37.7%。“十四五”期间,崇明区开展了以规划疏拓、生态治理及应急整治为主的三类骨干河道整治项目,在取得明显成效的同时也遭遇了规划定位、经济水平、征地动拆迁等方面的困难。通过对“十四五”期间崇明区骨干河道治理成效和遭遇问题的总结,从规划、设计和行政管理三个层面提出治理策略,并建议“十五五”期间崇明区骨干河道的治理方向应当向两个方面努力,即促使分段整治现状河口线基本达到规划的骨干河道岸段及开展若干轮骨干河道护岸应急整治。

    Abstract:

    The key rivers are the most important rivers in flood control, waterlogging drainage and water resources scheduling in Chongming, Changxing and Hengsha. There are 40 key rivers in Chongming District. The regulation rate of key rivers was about 37.7% by the end of the 13 th Five-Year Plan. During the “14 th Five-Year Plan” period, three types of key river regulation projects are carried out in Chongming District, mainly focusing on planning, expansion, ecological control and emergency rectification. While achieving the remarkable results, the difficulties have also been encountered in terms of planning positioning, economic level, land acquisition and demolition in Chongming District. By summarizing the achievements and problems encountered in the regulation of key rivers in Chongming District during the “14th Five-Year Plan” period, the regulation strategy is proposed from three levels of planning, design and administration. And it is suggested that the regulation direction of key river regulation in Chongming District should strive in two aspects during the “15th Five-Year Plan period, that is to carry out the segmented rectification of the current estuary line to basically reach the planned key river bank section and conduct several rounds of emergency rectification of the key river bank protection.

    参考文献
    相似文献
    引证文献
引用本文

杨蔚为,陈志颖,蔡磊.崇明区骨干河道治理现状及“十五五”工作展望[J].城市道桥与防洪,2025,(6):178-182.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2025-01-10
  • 最后修改日期:2025-01-16
  • 录用日期:2025-03-24
  • 在线发布日期: 2025-06-19
  • 出版日期:
关闭