    摘要:

    污水处理厂出水标准的要求越来越高,探寻适应进水C/N比低且脱氮效率高、出水水质好的污水处理工艺甚为迫切。深圳市某片区需新建1座设计规模为10×104 m3/d、生活污水与工业废水合建(系统独立运行)的全地下污水处理厂。以生活污水处理系统为研究对象,采用“粗格栅—细格栅—曝气沉砂池—多级AO生反池—二沉池—磁混凝高效沉淀池—精密过滤器—紫外消毒”工艺,出水执行《地表水环境质量标准》(GB3838—2002)准Ⅲ类标准(CODCr、TN除外)。生反池采用多级AO和AOA可切换双工艺,绿色低碳,且满足提标要求;污泥干化热源和综合楼空调采用污水源热泵,碳排放量减少23%以上;基坑内支撑创新采用预制装配式钢桁架,建设工期节约2个月,节约成本10%。工程用地标准仅为0.25 m2/(m3·d-1),仅为深圳市用地指标的50%。

    Abstract:

    As the effluent standards for wastewater treatment plants (WWTP) are getting higher and higher, it is urgent to explore the sewage treatment processes that are suitable for low influent C/N ratio, high denitrification efficiency and good effluent quality. A new WWTP with the design scale of 10×104 m3/d is required to build in an area of Shenzhen, which is a fully underground WWTP in the co-construction form of domestic sewage and industrial wastewater (operated independently). Taking the domestic sewage treatment system as the research object, the process of "coarse screen - fine screen - aerated grit tank - multi-stage AO biological reaction tank - secondary sedimentation tank - magnetic coagulation efficient sedimentation tank - precision filter - UV disinfection" is adopted, and the effluent meets the quasi-class Ⅲ standard of the Environmental Quality Standards for Surface Water (GB3838—2002), excluding CODCr and TN. The multi-stage AO and AOA switchable dual process is adopted for the biological reaction tank, which is green and low-carbon and meets the requirements for upgraded standards. The sewage-source heat pumps are used for the sludge drying heat sources and air conditioning in the complex building. The carbon emissions have been reduced by more than 23%. The innovative prefabricated steel trusses are used for internal support in the foundation pit, which save the construction period by 2 months and reduce the costs by 10%. The land use standard for the project is only 0.25 m2 / (m3·d?1), which is just 50% of land use indicator in Shenzhen.

    参考文献
    相似文献
    引证文献
引用本文

何磊.更高出水标准的南方某全地下污水处理厂设计[J].城市道桥与防洪,2025,(7):214-219.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2025-01-13
  • 最后修改日期:2025-01-18
  • 录用日期:2025-01-21
  • 在线发布日期: 2025-07-20
  • 出版日期:
关闭