Abstract:Relying on the engineering practice, the full-casing full-rotation clearing technology is used to comprehensively dispose the underground abandoned pipelines of newly built urban elevated expressways in order to remove the harmful substances such as waste gases inside the pipelines. Then, the segmented layered pipeline mud filling technology is used to effectively backfill and reinforce the abandoned pipeline. The post-construction detection results show that the disposing effect of abandoned pipelines is excellent, which can meet the construction requirements of existing roads and new elevated bridge pile foundations, and provide reference for similar projects in the future.