Abstract:Taking the waterlogging drainage planning of Wuyao Reclamation Polder area in Chongming District in Shanghai as an example, the application of a hydrodynamic model for river networks under the specific planning and design standards is studied. By studying the indicators such as water volume, water level and water flow of the river network, the multiple schemes are compared and selected, the multiple factors are taken into comprehensive consideration, the layout and scale of pump and sluice gate, the river surface ration and related parameters are rationally determined in the regional river network, and the scientific and reasonable management and dispatching measures are supplemented so as to control the highest water level of waterlogging drainage in the regional river network and ensure the regional flood control safety.