Abstract:The overall layout and main beam design of the steel-concrete composite continuous beam bridge is adopted for the Pudong Canal in the Chuanzhou Highway. The design of the steel-concrete combined segment of continuous beam bridge is reviewed. Based on the above summary, the modeling analysis and layout introduction are conducted for the overall design, prestressing arrangement, steel grid-cell structure and vertical shear resistance structure of steel-concrete combined segment of this bridge. At the present, the single-box single-chamber cross section is adopted for the built bridge. Due to the wider cross section of the Pudong Canal, the single-box four-chamber cross section is used. Therefore, the special design is required, and the structure should be innovated. In order to analyse and verify the safety and rationality of the structural design, the stress analysis and partial results of steel-concrete composite segment are briefly introduced.