Abstract:The in-situ river ecological remediation (ISER) technology is used to innovatively realize the low-carbon recycling of dredged sediment through the closed -loop mode of “mud treatment - resource conversion - ecological remediation”, and combines the dual advantages of environmental friendliness and engineering economy. The resource recycling feature effectively resolves the high carbon emission predicament of traditional sludge transportation and disposal. And the composite ecological bank protection structure not only enhances the stability of the bank slope, but also significantly improves the biological habitat function of the water-land transition zone of rivers and lakes. Taking the ISER ecological bank protection technology for restoration utilized in the ecological clean small watershed project in Zhuangxing Town, Fengxian District (including the governance units such as Changti Village and Pandian Village) as an example, the construction management essentials and quality control standards of in-situ resource-based ecological bank protection technology of dredged sediment are explained in detail. The aim is to standardize the construction and management of IESR ecological bank protection and ensure the safe implementation of the project, which provides the references for the construction of ISER ecological bank protection projects.