Abstract:In recent years, the construction of urban rail transit in China has achieved leapfrog development, and China has now become the country with the longest subway mileage in the world. However, with the increase of subway operation time, the development and utilization of the surrounding underground space, and the continuous change of the external environment, the tunnel segment structure often suffers from convergence deformation, cracks, water leakage and other diseases. In order to ensure the safety and stability of the subway tunnel structure, the targeted treatment measures are taken for the above-mentioned common diseases and the treatment effects are analyzed. Relying on a project example, the comprehensive treatment measures such as leakage plugging, crack repair, micro-disturbance grouting, and permanent reinforcement of steel rings are adopted, and the combined technical path of “micro-disturbance grouting and steel ring reinforcement” is proposed. The construction technologies and treatment details are introduced in detail.