截挡排水结合的路堑高边坡治理策略模拟对比分析研究
作者:
作者单位:

广东省交通规划设计研究院集团股份有限公司,广东 广州 510000

作者简介:

熊鹏飞(1989—), 男, 硕士, 工程师, 从事道路工程设计及研究工作。

通讯作者:

中图分类号:

U416.14;TU997

基金项目:


Simulation, Comparative Analysis and Research on Treatment Strategy of Cutting High Slope Combined with Interception and Drainage
Author:
Affiliation:

Guangdong Communication Planning and Design Institute Group Co., Ltd., Guangzhou 510000, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    采矿露天边坡的变形预测及风险控制对于施工指导有积极意义,以增天高速某采石场弃渣堆积体边坡为研究工程案例,针对路基段渗水情况,分析矿坑与地下水的水力联系,采用大型原位测试获取岩土体参数,计算分析其滑动面。提出了边坡清方减载下部边坡采用抗滑桩+锚索加固的加固方案和原状抗滑桩锚索加固方案。边坡止水采用坡面设置截水沟,路基段采用旋挖咬合工艺施工的素混凝土桩隔水墙+顶管法施工的排水隧洞,结合PLAXIS数值模拟评价分步施工计算两种方案对边坡体变形安全的控制效果,结合监测剖面数据对比,得出清方减载方案的安全和施工经济优越性,工程的设计研究成果取得良好效果,同时能够更精确掌握施工安全情况。

    Abstract:

    Deformation prediction and risk control of open-pit mining slope have the positive significance for construction guidance. Taking the slag dump slope of a quarry in Zengtian Expressway as a research project case, aiming at the water seepage of subgrade section, the hydraulic connection between mine pit and groundwater is analyzed, and the parameters of rock and soil mass are obtained by large-scale in-situ testing, and the sliding surface is calculated and analyzed. A reinforcement scheme of using anti-slide piles and anchor cables for the lower slope after earthwork clearanc and load reduction of slope, as well as an original anti-slide pile and anchor cable reinforcement scheme, are proposed. The slope waterproofing is achieved by setting up a water interception ditch on the slope surface, and a plain concrete pile waterproofing wall constructed by rotary drilling and interlocking technology and a drainage tunnel constructed by pipe jacking method are used in the subgrade section. Combined with the PLAXIS numerical simulation, the control effect of the two schemes of step-by-step construction calculation on the deformation safety of the slope body is evaluated. Combined with the comparison of monitoring profile data, the safety and construction economic superiority of the earthwork clearance and load reduction scheme are obtained. The design and research results of the project have achieved the good effects, and at the same time, the construction safety situation can be more accurately grasped.

    参考文献
    相似文献
    引证文献
引用本文

熊鹏飞.截挡排水结合的路堑高边坡治理策略模拟对比分析研究[J].城市道桥与防洪,2025,(11):27-33.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2025-04-21
  • 最后修改日期:2025-05-15
  • 录用日期:2025-05-16
  • 在线发布日期: 2025-11-20
  • 出版日期:
关闭