Abstract:In the bridges of various grades of roads in China, small-span and medium-span bridges account for a large proportion, and the bent cap piers are commonly adopted for the substructures. The traditional substructures are constructed by the cast-in-place method, and it is necessary to set up the formwork supports, which takes a long time and has a significant impact on traffic and the environment. With the advancements in industrialization, the mechanical equipment, construction precision, transportation and hoisting capabilities have been enhanced. In recent years, the prefabricated and assembled pier technology has been promoted and applied, which has significantly improved the construction efficiency, and enhanced the construction safety and quality control levels. The relevant industry authorities have organized and completed the compilation of the standard drawing set for Design and Construction of Prefabricated Bridges. The compilation process, calculation methods, construction design and application scope of the drawing set are emphatically introduced.