Abstract:In the design of utility tunnel projects, to make the scheme simultaneously meet the requirements of functional needs, structural safety and economic applicability, it is usually necessary to compare multiple schemes. The final scheme must satisfy multi-dimensional requirements such as structural safety, functional adaptation and economic rationality. The content of scheme comparison mainly focuses on the layout scheme of utility tunnel, the form of the enclosure structure, the reinforcement of foundation pit foundation, and the other links. Taking a utility tunnel project in Shanghai as the research object, the in-depth analysis and research on the above three aspects are conducted, and the reliable data are obtained through quantitative calculation. Its aim is to provide reference in terms of economic indicators for designers in scheme comparison to realize the optimization of economic applicability of the project on the premise of ensuring the functional needs and structural safety of the project.