Abstract:Relying on the Suzhou Dushuhu Avenue Expressway Reconstruction Project, the overview of functional positioning, service targets and overall layout scheme of this expressway construction is provided, and the overall laying form, entrance and exit layout, and construction scale of the Dushuhu Avenue expressway are analyzed and explained in detail. There are two important interchange transfer nodes in the project, which are limited by multiple factors such as existing structures, pipelines, rivers and high-voltage lines. On the premise of meeting the node traffic functions, the construction and reconstruction schemes of the interchange under multiple limiting factors are studied and compared, and the relevant engineering design schemes are determined to solve the limitation problems and realize the interchange functions, which provides the reference for the interchange construction schemes in the complex nodes in the future.