浙江省某大型水质污水厂扩建项目设计实例
作者:
作者单位:

宁波市水务环境集团股份有限公司工程建设管理分公司,浙江 宁波 315046

作者简介:

龚天翼(1987—), 男, 本科, 高级工程师, 从事城市净水设施运营及工艺研究工作。

通讯作者:

中图分类号:

TU992.3

基金项目:

上海市政总院“拂晓计划”


Design Example of an Expansion Project for a Large Water Purification Plant in Zhejiang Province
Author:
Affiliation:

Engineering Construction Management Branch, Ningbo Water Environment Group Co., Ltd., Ningbo 315199, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对浙江省某大型水质净化厂扩建项目面临的更加严格的出水水质要求,提出一套稳定达标且低碳运行的工艺方案,为高标准排放污水厂扩建及提标改造工程提供参考。在复核设计进出水水质和受纳水体容量约束的基础上,构建了“粗格栅进水泵房+细格栅曝气沉砂池+改良型巴顿甫生物池+高效沉淀池+硫自养脱氮滤池+次氯酸钠消毒”的工艺路线,并通过200 m3/d硫自养脱氮中试装置验证低温及峰值流量工况下的脱氮能力。中试结果表明:进水水温13 ℃以上、空床接触时间(EBCT)为26.17~31.40 min时,硫自养脱氮滤池可保持稳定脱氮效果;在峰值流量工况下,EBCT为20.93 min仍可满足6 mg/L的脱氮需求。该工艺在低碳氮比条件下可有效减少对外加有机碳源的依赖,并通过精准曝气、反洗控制及碱度管理,实现总氮的稳定达标与低碳运行。

    Abstract:

    In view of the more stringent effluent quality requirements for the expansion project of a large-scale water quality purification plant in Zhejiang Province, a set of process schemes that are stable, compliant and operate in a low-carbon manner is proposed, providing a reference for the expansion and upgrading project of high-standard discharge wastewater treatment plant. Based on an recheck of the designed influent and effluent qualities and the capacity constraint of the receiving water body, a process route of “coarse screen and influent pump house + fine screen and aerated grit chamber + modified Bardenpho bioreactor + high-efficiency sedimentation tank + sulfur autotrophic denitrification filter + sodium hypochlorite disinfection” is built. And the denitrification capacity under low-temperature and peak flow conditions is verified through a 200 m3/d sulfur autotrophic denitrification pilot plant. The pilot-scale results show that when the influent temperature is above 13 °C and the empty bed contact time (EBCT) is 26.17~31.40 min, the sulfur autotrophic denitrification filter can maintain a stable nitrogen removal effect. Under the peak flow condition, the EBCT as 20.93 min can still meet the denitrification demand of 6 mg/L. This process can effectively reduce the reliance on external organic carbon sources under the condition of a low carbon-nitrogen ratio. And through the precise aeration, backwash control and alkalinity regulation, the stable compliance with total nitrogen standards and the low-carbon operation are achieved.

    参考文献
    相似文献
    引证文献
引用本文

龚天翼,相宁,张晟宁.浙江省某大型水质污水厂扩建项目设计实例[J].城市道桥与防洪,2026,(6):336-340.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2025-10-22
  • 最后修改日期:2026-05-18
  • 录用日期:2026-05-19
  • 在线发布日期: 2026-06-11
  • 出版日期:
关闭