Abstract:With the development of the city and the expansion of the urban area, the key areas such as Shanghai Hongqiao and Zhangjiang have gradually formed urban development patterns that are close to those within the ring. The Outer Ring Road has gradually become a barrier to the development of areas on both sides of the Inner and Outer Ring roads in key regions such as Hongqiao and Zhangjiang. In order to close the cracks in the city, open up the areas on both sides, and improve the regional road network, a study on the function improvement of the eastern section of the Outer Ring Road is conducted in Pudong New District. Firstly, the traffic function improvement project of the eastern section of the Outer Ring Road (Huaxia Middle Road - Longdong Avenue) is implemented. The Chuanyang River is the key node of the project. In order to ensure that the three transverse intersecting roads are completed and opened to traffic simultaneously with this project, it is necessary to conduct a detailed comparison and selection of the Chuanyang River node scheme, which will help save the project construction period and project cost.