Abstract:Taking the Xi'an South Ring II Yanta Interchange Reconstruction Project as the background, the systematical study is conducted on the key technical challenges in widening and reconstructing the old bridges under complex urban traffic environments. The overall design principle of “superstructure hinged, substructure separated” is proposed. The widening techniques are innovatively adopted, including a longitudinal curved expansion joint and a transverse “integral steel box girder + stiffness coordination” approach. Through the finite element analysis, the effectiveness of the collaborative working mechanism between new and old bridges, the refined design of longitudinal joints, the controlled construction measures based on the settlement protection of subway, and the reliability assessment of the new and old connection are verified. The results show that the proposed technical scheme can effectively control differential settlement between new and old bridges, and ensure the structural integrity and durability after widening. The reliability analysis based on the response surface method provides the recommended allowable deflection values at the east and west splicing locations, offering technical references for similar old urban bridge reconstruction projects.