Abstract:Taking a newly-built low-pylon cable-stayed bridge with a span arrangement of (115 m+180 m+115 m=410 m) in Shanghai as the research object, the actual force-bearing performance of the bridge is verified through dynamic and static load tests. The bearing capacity, stiffness, stability and dynamic characteristics of the bridge are examined to determine whether or not to meet the design and specification requirements, which provides an initial basis for the completion acceptance and subsequent detection and evaluation of the bridge. The finite element numerical simulation method is used for theoretical analysis to determine the reasonable static load test conditions. Based on this, on-site static and dynamic load tests are conducted on the actual bridge to obtain the key measured data such as structural strain, deflection and vibration frequency. The test values are compared and analyzed with the theoretical values. The comparison results show that the overall force-bearing state of the bridge is good, which meets the design and relevant specification requirements. The measured responses are in good agreement with the theoretical calculation results, which can provide basic data for the later operation monitoring and safety assessment of the bridge.