Abstract:Restricted by construction site conditions, the simple-supported structures with a single span across the river are generally preferred for belt conveyor river-crossing bridges. However, the simple-supported structures with a span exceeding 130 m are rarely seen. Taking a 1-176 m through steel truss belt conveyor pipe rack bridge as the research object, the focus is on the elaboration of the key design points including the overall layout, structural type and critical components. Combined with finite element and relevant specifications, the strength, deformation and stability of the upper main structure are analyzed. In view of the geographical advantages of the bridge location, the erection scheme of the bridge is briefly introduced. The results show that with reasonable structural details and proper reduction of dead load, the strength, stiffness and stability of the main bridge structure can fully meet the specification requirements. With reasonable force performance, economical cost and feasible construction, the bridge has been in safe operation for more than five years, which provides a reference for similar engineering projects.