存量更新理念下桥梁群景观分级改造策略
作者:
作者单位:

同济大学建筑设计研究院(集团)有限公司,上海市 200092

作者简介:

廖优斌(1991—), 男, 硕士, 工程师, 从事景观桥梁方案创作、 桥梁结构设计工作。

通讯作者:

中图分类号:

U442.5

基金项目:


Graded Renovation Strategy of Bridge Group Landscape under Concept of Stock Renewal
Author:
Affiliation:

Tongji University Architectural Design and Research Institute (Group) Co., Ltd., Shanghai 20009, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在城市更新背景下,既有桥梁群的景观提升是实现滨水空间提质与城市特色彰显的关键举措。以德州市中心城区跨越岔河、减河的10座桥梁为例,提出一套面向存量更新的系统性提升策略。通过构建涵盖地域、交通、文旅等六大维度的桥位重要性综合评价模型,科学划定桥位改造优先级,指导资源精准配置。核心策略遵循主题引领、分级施策的原则,针对不同桥位,综合运用涂装翻新、构件更换、景观拼宽及夜景亮化等轻量化手法,并采用“近期轻改+远期更新”的时序组合。分级改造策略的实施成效分为前期决策阶段的应用价值与后期运营阶段的实际效果两部分:评价体系已成功应用于项目前期的论证决策,建成后的长期效果仍有赖于后续运营的持续观测与验证。

    Abstract:

    Against the backdrop of urban renewal, landscape enhancement of existing bridge groups is a key measure to enhance the quality of waterfront spaces and highlight the characteristics of the city. Taking 10 bridges spanning the Cha River and Jian River in the central urban area of Dezhou City as examples, a set of systematic enhancement strategy oriented toward stock renewal is proposed. By constructing a comprehensive evaluation model for bridge site importance covering six dimensions including regional characteristics, transportation, cultural tourism and others, the priority of bridge sites for renovation is scientifically divided to guide the precise allocation of resources. The core strategy follows the principles of theme guidance and graded implementation. For different bridge sites, lightweight techniques such as coating renovation, component replacement, landscape widening and nightscape lighting are comprehensively applied, and a time-sequence combination of short-term light modification and long-term renewal is adopted. The outcomes of the graded renovation strategy consist of application value at the pre-decision phase and practical effects at the post-operation phase. The evaluation system has been successfully adopted for pre-project demonstration and decision-making. The long-term effect after completion still depends on the continuous observation and verification of subsequent operations.

    参考文献
    相似文献
    引证文献
引用本文

廖优斌.存量更新理念下桥梁群景观分级改造策略[J].城市道桥与防洪,2026,(11):214-220.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-04-28
  • 最后修改日期:2026-09-29
  • 录用日期:2026-05-20
  • 在线发布日期: 2026-11-18
  • 出版日期:
关闭