Abstract:The G1503 Expressway Bridge of the Wusong River Project has a total length of 705.5 m after reconstruction and expansion, which is composed of the main bridge, retained and utilized approach bridge and newly-built approach bridge. The main bridge is a 104 m-span steel truss girder bridge with orthotropic composite bridge deck. The total deck width is 37.2 m, separated arranged, and the width of a single-separated bridge deck is 18.2 m. The main truss is arched truss and N-type layout. The mid-span truss height is 10 m without top lateral bracing. The upper and lower chord members are designed with rectangular sections, and the web members are in I-shaped sections. The bridge deck is orthotropic composite deck slab, and the standard beam spacing is 4 m. The structural height is effectively reduced by a low layout of beams. After the pier cutting and jacking of the approach bridge in the retained utilization section is raised to the designed height, the piers are wrapped with carbon fiber cloth to enhance their seismic ductility, load-bearing capacity and crack resistance. The approach bridges near the main bridge adapt to the changes in planar alignment by replacing beams. The newly-built approach bridge adopts prestressed concrete rigid-connected hollow slab girder structure. The demolition and reconstruction of the main bridge and the jacking and utilization of some approach bridges not only meet the requirements of flood discharge and navigation, but also control the scale of the bridge, improve the construction efficiency, and have good economic performance.