Abstract:Open-pit mines and goaf areas are widely distributed in China. More and more highway projects pass through mining areas. This complex geological condition poses great challenges to highway construction and operation. Therefore, the research on highway construction schemes is particularly important. Relying on a first-class highway project in Hubei Province, and based on the geological survey results, a comparative analysis is conducted on the highway construction schemes passing through areas with open-pit mines and goaf areas. Combined with local conditions, a treatment scheme for goaf areas is proposed. And the schemes of roadbed filling and bridge crossing are compared and analyzed from aspects such as technical feasibility, economy and construction difficulty. A comprehensive construction scheme of first treating the goaf area with grouting and then filling the open-pit mine is obtained. This construction scheme is calculated using Flac3D three-dimensional numerical simulation. The simulation results show that the maximum settlement after filling is 71mm, and the overall state is basically stable, verifying the rationality of the scheme, which can provide certain references for highway engineering construction under similar geological conditions.