槽型钢梁跨高速随梁集成防护施工技术
作者:
作者单位:

1.武汉市政环境工程建设有限公司,湖北 武汉 430000
2.武汉市市政建设集团有限公司,湖北 武汉 430000

作者简介:

李云(1992—), 男, 学士, 工程师, 技术负责人, 从事市政道路、 桥梁工程施工工作。

通讯作者:

中图分类号:

U415

基金项目:


Beam-Integrated Protection Construction Technology for Channel Steel Beams Spanning Expressway
Author:
Affiliation:

1.The Fourth Branch of Wuhan Municipal Environment Co., Ltd., Wuhan 430000, China
2.Wuhan Municipal Construction Group Co., Ltd., Wuhan 430000, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对50 m大跨径开口槽型钢梁跨运营高速公路施工中焊接火花坠落风险及传统移动防护棚方案的突出安全隐患,提出一种随梁集成式装配防护托架施工工艺。该工艺在开口槽钢梁底部增设封闭钢板以截留焊渣,在梁体两侧腹板焊接高强吊耳并安装可拆卸三角托架,将防护体系与主梁集成为整体,并利用320 t级架桥机实现一体化同步吊装。通过荷载组合验算,验证了采用集成工艺的钢梁吊耳、斜撑杆及底板的强度、稳定性和刚度均满足规范要求,并且可减少独立吊装次数约75%,缩短施工工期约60%,降低高空作业工时约62.5%,防护构件可周转3~4次,单榀梁防护成本较传统方案降低约35%。结果证明集成工艺可有效解决大跨径钢梁跨线施工中的焊渣坠落和高空防护难题,安全效益与经济效益显著,可为类似跨线桥梁工程提供技术参考。

    Abstract:

    To address the falling weld-spatter hazards and safety deficiencies of conventional mobile protective shed schemes during the erection of 50 m long-span open-channel steel beams spanning an operating expressway, an integrated assembled protection bracket construction technique is proposed. In this method, the sealed steel plates are added at the bottom of the open-channel beam to intercept the weld slags. The high-strength lifting lugs are welded to both webs of beam and the detachable triangular brackets are mounted, integrating the protection system with the beam for simultaneous hoisting by a 320 t beam-erection machine. Through the combined load calculations, it is verified that the strength, stability and stiffness of the lifting lugs, diagonal struts and bottom plate with the integrated process meet the code requirements. And the independent hoisting operations can be reduced by approximately 75%, the construction period shortened by about 60%, the high-altitude working hours reduced by roughly 62.5%, the protective components reused 3 to 4 times, and the protection cost of a single beam reduced by approximately 35% compared to the traditional schemes. The results prove that the integrated process can effectively solve the problems of slag fall and high-altitude protection in the overpass construction of long-span steel beams. The safety and economic benefits are significant, which can provide technical references for similar overpass bridge projects.

    参考文献
    相似文献
    引证文献
引用本文

李云.槽型钢梁跨高速随梁集成防护施工技术[J].城市道桥与防洪,2026,(11):350-355.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-05-19
  • 最后修改日期:2026-05-25
  • 录用日期:2026-05-28
  • 在线发布日期: 2026-11-18
  • 出版日期:
关闭