复杂水动力条件下滨海软基圈围海堤设计与施工关键技术研究
作者:
作者单位:

上海市堤防泵闸建设运行中心,上海市 200080

作者简介:

邹丹(1976—), 男, 硕士, 高级工程师, 从事水利工程管理工作。

通讯作者:

中图分类号:

TU47

基金项目:


Study on Key Design and Construction Technologies of Coastal Soft Soil Enclosure Seawall Under Complex Hydrodynamic Conditions
Author:
Affiliation:

Shanghai Embankment Pump Sluice Construction and Operation Center, Shanghai 200080, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对长江口与杭州湾交汇处水动力复杂、风浪大、软基承载力低、砂源不足、工期紧等圈围难题,依托上海港临港产业区奉贤分区圈围工程,针对软基海堤结构、水动力调控、地基处理与施工组织关键技术,提出“顺应河势演变、分区可控施工、结构适应沉降”思路,比选确定复合斜坡式土石坝断面;建立长江口—杭州湾二维水流数学模型,量化中港出海口流态与冲淤变化,据此增设西侧导流堤束水冲淤;对厚层淤泥地基采用“吹砂挤淤+反压加载+塑料排水板固结+土工格栅加筋”复合处理;提出“一步到位、分期实施”施工方案。实施后堤顶高程降低0.5 m,每公里节约投资50万元、节省占地3 000 m2,海堤历经多年台风考验整体稳定、无病害,供同类工程参考。

    Abstract:

    To address the challenges of complex hydrodynamics, strong waves, low bearing capacity of soft tidal-flat foundations, insufficient sand sources and tight construction schedules at the junction of the Yangtze Estuary and Hangzhou Bay, this study investigates key technologies for soft-foundation seawall structures, hydrodynamic regulation, ground treatment and construction organization, based on the reclamation project in the Fengxian Sub-area of the Shanghai Port Lingang Industrial Zone. A design concept of "following river-regime evolution, zoned controllable construction and structures adapting to settlement" is proposed, and a composite sloping earth-rock dam section is selected through comparison. A large-scale two-dimensional flow model of the Yangtze Estuary–Hangzhou Bay is established to quantify the flow pattern and erosion–deposition changes at the Zhonggang outlet before and after construction, on which basis a west-side diversion dike is added to concentrate flow and scour the channel. For the thick muddy foundation, a composite treatment combining sand-blowing replacement, surcharge loading, plastic drainage board consolidation and geogrid reinforcement is adopted, together with a "one-step completion with staged implementation" construction scheme. After implementation, the crest elevation was lowered by 0.5 m, saving about RMB 0.5 million in investment and 3000 m2 of land per kilometre; the seawall has remained stable, free of excessive settlement, slope damage, toe scour and outlet siltation after years of flood seasons and typhoons, providing a reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

邹丹.复杂水动力条件下滨海软基圈围海堤设计与施工关键技术研究[J].城市道桥与防洪,2026,(11):280-286.