Abstract:To address the problems of insufficient basis for determining dredging scope, unclear identification of key pipe sections and inadequate re-inspection of dredging effects, a targeted dredging priority determination method based on sedimentation degree, structural condition and operational risk is proposed. The sedimentation thickness ratio is used to characterize the sedimentation condition of pipe section, and a weighted priority index is established by combining structural condition and operational risk to determine the dredging grade and differentiated dredging techniques. Taking the drainage pipe network dredging project of Macheng City as an example, 526.34 km of pipelines are investigated. The results show that compared with the traditional full-line pipeline dredging, the targeted dredging can reduce the dredging operation length by 54.53 km, with a reduction rate of 25.90%. The comprehensive cost is decreased by 12.39%, the integrated construction period shortened by 20.73%, and the average sediment removal rate reached 93.30%. The method can improve the pertinence and economy of dredging decision-making.