排水管网靶向清淤优先级判定方法及工程应用
作者:
作者单位:

1.中国市政工程中南设计研究总院有限公司,湖北 武汉 430014
2.湖北省水利水电科学研究院,湖北 武汉 430070
3.湖北省节约用水研究中心,湖北 武汉 430070

作者简介:

付 铭(1991—), 男, 学士, 高级工程师, 从事市政给排水管网探测检测研究工作。

通讯作者:

中图分类号:

TU992

基金项目:

湖北省自然科学基金项目(2026AFC1187)


Priority Determination Method and Engineering Application of Targeted Dredging for Drainage Pipe Networks
Author:
Affiliation:

1.Central and Southern China Municipal Engineering Design and Research Institute Co., Ltd., Wuhan 430014, China
2.Hubei Water Resources Research Institute, Wuhan 430070, China
3.Hubei Water Saving Research Center, Wuhan 430070, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对排水管网清淤范围划定依据不足、重点管段识别不清及复核评价不充分等问题,提出基于淤积程度、结构状态和运行风险的靶向清淤优先级判定方法。以淤积厚度比表征管段淤积程度,结合结构状态初判和运行风险分级,构建加权优先级指数,确定清淤等级和差异化清淤工艺。以麻城市排水管网清淤工程为例,累计探查管网长度达526.34 km。结果表明,相较于传统全线管网清淤,靶向清淤可减少清淤作业长度54.53 km,降幅达25.90%;综合成本下降12.39%,综合工期缩短20.73%;平均淤积清除率达93.30%。该方法可提高清淤决策的针对性和经济性。

    Abstract:

    To address the problems of insufficient basis for determining dredging scope, unclear identification of key pipe sections and inadequate re-inspection of dredging effects, a targeted dredging priority determination method based on sedimentation degree, structural condition and operational risk is proposed. The sedimentation thickness ratio is used to characterize the sedimentation condition of pipe section, and a weighted priority index is established by combining structural condition and operational risk to determine the dredging grade and differentiated dredging techniques. Taking the drainage pipe network dredging project of Macheng City as an example, 526.34 km of pipelines are investigated. The results show that compared with the traditional full-line pipeline dredging, the targeted dredging can reduce the dredging operation length by 54.53 km, with a reduction rate of 25.90%. The comprehensive cost is decreased by 12.39%, the integrated construction period shortened by 20.73%, and the average sediment removal rate reached 93.30%. The method can improve the pertinence and economy of dredging decision-making.

    参考文献
    相似文献
    引证文献
引用本文

付铭,唐乐乐,周武刚,王鹤,杨韩.排水管网靶向清淤优先级判定方法及工程应用[J].城市道桥与防洪,2026,(11):265-269.