Abstract:With the development of cities and industries, the expansion of existing wastewater treatment plants (WWTPs) faces common issues such as limited land availability, complex influent water quality, and the inability to suspend production for construction. The design of the Jiading New Town Wastewater Treatment Plant Phase III Expansion Project is based on a thorough analysis on the current plant facilities and the characteristics of the influent water quality. And a combined process scheme centered around “modified AAO + MBBR suspended packing process + magnetic coagulation high-efficiency sedimentation tank + precision filtration” is proposed. By enhancing the efficiency of the biological system and its ability to resist shock loads, the interference of industrial water is addressed and the systematic integration with existing treatment facilities is achieved to complete the expansion and meet the discharge standards, providing technical references for the expansion design of similar existing WWTPs.