Abstract:Xingxingxia Town of Hami is located in gobi and desert areas, where evaporation far exceeds precipitation, resulting in the frequent formation of saline soil subgrade. Taking G30 Comprehensive Parking Area Project at Xingxingxia, Hami City as the research object, based on regional geological conditions, surface water and groundwater data as well as geotechnical investigation borehole data of the project, the total soluble salt content, the ratio of Cl- to SO42- and Na2SO4 content are calculated in compliance with relevant national and local specifications. Accordingly, the classification of saline soil and its salt expansion characteristics within the project site are determined. Based on the calculation results, a combined subgrade treatment scheme consisting of raising subgrade elevation, subgrade material replacement and installation of subgrade isolation layer is proposed from an economic perspective combined with the characteristics of local road construction materials. Relevant construction suggestions concerning subgrade construction scheduling, filler test inspection and composite geomembrane laying are put forward to guarantee construction quality.