Abstract:When building co-corridors of urban tunnels and urban railways, the both influence and restrict each other in terms of spatial layout, engineering design and construction sequence, making the engineering construction relatively difficult and complex. Taking the Shanghai Waiqingsong Highway Reconstruct Project as an example, the main line tunnel, along with the demonstration zone line of the urban railway and the Jiading - Qingpu - Songjiang - Jinshan Line, is arranged and constructed in the co-corridor along the existing Waiqqingsong Highway within a 3.2 km radius of Qingpu New Town. The project route also involves the external control objects such as operational rail transit lines and navigable rivers, and the scheme needs to be comprehensively considered by taking into account various factors. By analyzing the spatial positional relationship of the both, mutual influence of engineering design, and the external control conditions along the line, the overall layout and key node design schemes of the both co-corridor construction are presented. By analyzing the mutual influence of the construction sequences of the both, a scheme for reserving engineering conditions is presented. The relevant design schemes and experience summaries can be used as references for similar projects in the future.