Abstract:As the core barrier of regional tide-prevention system, the East Embankment of Zhuhai has been in service for 16 years. Under the coupled effects of repeated typhoon strikes and long-term marine hydrodynamic forces, the embankment suffers from typical defects including structural aging, foundation scour and damage of armor blocks. In addition, the 536 m-wide gap within the project has not been closed for a long time, which prevents the regional tide-prevention system from forming a closed protective loop and brings prominent flood and tide safety hazards. Relying on field investigation and engineering safety assessment, this paper systematically analyzes the damage characteristics of the existing embankment and reveals the restriction mechanism of the gap on the closed tide-defense performance. A comprehensive treatment scheme is proposed combined with the hydrogeological boundary conditions of the site. After reconstruction, the tide-defense standard of the embankment can be effectively improved and the nearshore hydrodynamic environment optimized. The research results can provide theoretical basis and technical references for the closure and reconstruction of similar sea dikes with open gaps in China.