Abstract:Based on the Analysis of the Present Situation of Gusaoshu Interchange, and discussion from design standards and intersection roads, horizontal and vertical design of three ramps of Gusaoshu interchange,Perfecting the function of interchange steering,Giving full play to the function of gusaoshu interchange as an important node connecting the third ring, Tianhe Airport and Hankou in Wuhan City.The construction of distribution lanes along the top road of Zhanggong Embankment,It is the longest ramp with one hundred-year flood control and traffic distribution functions.The traffic gate is the largest bridge-gate integrated traffic gate with manual hoist driven opening and closing on existing Zhanggong Embankment.